Only Critical Construction Allowed During FMCO 3.0 Period
Only Critical Construction Allowed During FMCO 3.0 Period
As part of the effort to curb the spread of the COVID-19 pandemic in the construction sector, all construction work nationwide would be stopped during this FMCO period. However, exceptions are granted to the works listed in Critical Services. These include:
- Critical maintenance and repair works, ie. work which if not continued could cause danger or harm to workers, the public or the environment
- Construction works involving major and critical public infrastructure
- Professional services/ consultants involved in construction works that are permitted to operate as listed in items (1) and (2) as above
- Services in the supply chain that involve construction works that are permitted to operate as in items (1) and (2) as above.
Read More:
- English Version (Coming Soon)
- BM Version